Rooflight advice
Preparing Your Rooflight Upstand Before Delivery
Preparing the upstand is a coordination task between the builder, roofer and rooflight installer. Agree the selected product and its support detail before the work is covered up.

Allocate responsibility clearly
Identify who forms the structural opening, builds and insulates the kerb, applies the roof covering and installs the rooflight. Agree the point at which the dimensions and completed support will be checked. A supply-only product order does not include those site responsibilities.

Check the detail against the product
Use the selected product’s current drawing for the measurement reference, support dimensions and required fall. Lanterns and flat skylights can have different details. For a replacement, check the existing support rather than assuming it is suitable because a previous rooflight fitted there.

Measure the completed work
Have the installer compare the finished measurements and diagonals with the order specification before fitting. Record the support and membrane junction while they are visible. If the dimensions or construction do not match, stop and resolve the discrepancy; forcing a unit into an unsuitable opening is not a remedy.

Plan the installation day
Prepare a safe unloading and lifting route, suitable storage and access to the roof. Keep the current installation manual available and ensure specified materials and equipment are ready. Protect the opening and the room below while work proceeds. Check the delivered parts before booking the final fitting sequence.
Need help with your project?
Send us your product choice, dimensions and installer’s drawing so we can help you identify the right specification and documents.
Contact Roof Lantern KitsCompare specifications and configure your rooflight
Have your installer confirm the selected product's ordering dimensions and support details before placing an order. Read the measuring guide and keep the final specification with your project drawings.

